OEM Manufacturing
You bring the design, the drawings or a working sample. We build the tooling, run pilot production, handle certification testing and ship serial production.
MOQ 500 pcs · Sample lead time 3–7 days · Lead time 25–35 days
OEM is the shortest route when the design already exists. You have the drawings, or a sample that works, and the question is whether it can be built at the target cost with a consistent quality level. The answer depends less on the assembly line than on the tooling and the incoming inspection behind it.
The work happens before steel
A drawing that looks complete on paper usually has three or four decisions left open: draft on a deep wall, a gate position that will leave a visible mark, a tolerance stack that closes only if two parts are at opposite ends of their range. We run a DFM review and return a written list — what we would change, what it costs if we do not, and which items are the buyer’s call.
That review is the cheapest part of the project and the one most often skipped when a supplier quotes from a photo.
Pilot run, not a sample batch
A pilot run uses the production fixtures, the production test limits and the production operators. A hand-built sample batch proves the design can be assembled by an engineer; a pilot run proves it can be assembled by a line. The difference shows up in yield, and in how long the first shipment takes.
What we ask for at the start
Drawings or a sample, the target market and its certification requirements, the target quantity and FOB price, and the timeline you are working to. With those four answers we can say whether the project is realistic before either side spends money on tooling.
At a glance
- What you provide
- 3D and 2D drawings, a working sample, or a reference product with a target specification
- What we provide
- DFM feedback, tooling, pilot run, certification testing and serial production
- MOQ
- 500 pcs for a standard platform; the tooling amortisation decides the number for a new mold
- Lead time
- 7 days for samples, 25–35 days for production after sample approval
- Ownership
- Tooling ownership written into the contract; the drawing and the mold are not used as leverage
What is included
How a project runs
- 01 Drawing review and DFM report
- 02 Quotation with tooling and unit cost separated
- 03 Tool making and T1 measurement
- 04 Sample approval and pilot run
- 05 Certification and serial production


Common questions
Can you build from a sample without drawings?
We can reverse-engineer a sample, but the result depends on how accurately it can be measured. Where the sample is critical, we prefer to model it, print it, and check the fit against your original before committing to steel.
Who owns the mold?
The buyer does, once the tooling is paid for. The terms of transfer are written into the contract, so moving the tool to another factory is a decision you can make.
What happens if T1 parts are out of tolerance?
We report the deviation against the drawing and correct the tool. Production is not released on a tool that has not yet met the drawing.
Other ways to work with us
OEM Manufacturing
Tell us the product, target market and volume. You get feasibility and a cost range in writing within 24 business hours.